Turnstile Installation and Configuration for Oman Arab Bank Head Office in Gobra
Completed on: 20 June 2026
TAOMAN completed turnstile installation and configuration work for Oman Arab Bank Head Office in Gobra.
| Client | Oman Arab Bank Head Office |
|---|---|
| Location | Gobra, Muscat, Oman |
| Project Type | Turnstile installation and configuration |
| Work Completed | Installation, configuration, testing and handover |
Scope of Work Completed
- Turnstile installation at the head office entrance area
- Floor cutting and drilling to fit the turnstile
- Laying network data and power cables
- Connecting the turnstile to the HID access control panel
- Soldering and fixing the damaged COM port on the turnstile control board
- Access-control configuration based on the required entry flow
- Coordination with the site team during installation
- Testing of the turnstile operation after configuration
- Basic handover guidance for the responsible team
Testing and Handover
The installed turnstile was tested for functionality and access flow before handover. The objective was to leave the site team with a working setup and a clear understanding of normal operation.
- Operation checked after setup
- Entry behaviour verified
- Final review conducted with the site team
- Handover instruction provided for normal operation mode
Need a Similar Turnstile or Access-Control Project?
TAOMAN supplies, installs and configures access-control systems for offices, banks, commercial buildings, schools, warehouses and other business sites across Oman.
See our Access Control System Oman page for related solutions, or contact us with your site details.
Need Help With Turnstiles or Access Control?
Tell us about your entrance, number of users and required access method. We will recommend the right setup for your site.